Best Construction Scheduling Software - Page 3

How Many Construction Scheduling Software Products Does G2 Track?

Total Products under this Category: 198

Category Stats (Nov 2026)

  • Average Rating: 4.39/5 (↓0.01 vs Oct 2026) The average rating of products in this category, based on all submitted ratings
  • Top Trending Product: UDA ConstructionOnline (+1.03%) - Among all products in this category, UDA ConstructionOnline recorded the largest rating increase compared to last month

Last updated: November 17, 2026

How Does G2 Rank Construction Scheduling Software Products?

Why You Can Trust G2's Software Rankings:

  • 30 Analysts and Data Experts
  • 63,400+ Authentic Reviews
  • 198+ Products
  • Unbiased Rankings

G2's software rankings are built on verified user reviews, rigorous moderation, and a consistent research methodology maintained by a team of analysts and data experts. Each product is measured using the same transparent criteria, with no paid placement or vendor influence. While reviews reflect real user experiences, which can be subjective, they offer valuable insight into how software performs in the hands of professionals. Together, these inputs power the G2 Score, a standardized way to compare tools within every category.

G2 Grid® for Construction Scheduling Software

G2 Grid® for Construction Scheduling Software plotting products by satisfaction and market presence

Highlighted products: Procore, Fieldwire by Hilti, Oracle Primavera, Contractor Foreman, Houzz Pro, UDA ConstructionOnline, Asta, and Outbuild.

Underlying data: [Grid® JSON](https://www.g2.com/categories/construction-scheduling/grids.json?focus%5B%5D=procore&focus%5B%5D=fieldwire-by-hilti&focus%5B%5D=oracle-primavera&focus%5B%5D=contractor-foreman&focus%5B%5D=houzz-pro&focus%5B%5D=uda-constructiononline&focus%5B%5D=eleco-asta&focus%5B%5D=outbuild)

SMACT

SMACT is a cloud-based Schedule Management and Control platform designed to simplify the way project teams analyse, report, and collaborate on schedules. Built by industry professionals from the Oil & Gas, Mining, and Construction sectors, SMACT turns complex scheduling data into clear, confident decisions - fast. The platform supports a range of common schedule file types and removes the need for specialist scheduling software. Whether you’re a planner, project engineer, or discipline lead, SMACT helps you visualise, validate, and communicate schedule information with speed and accuracy. SMACT combines accessibility, structured analysis, and automation to streamline how projects are managed - ensuring everyone is working from the latest, most reliable version of the schedule.

Average Rating: 4.5/5.0

Total Reviews: 1

Who Is the Company Behind SMACT?

Who Uses This Product?

  • Company Size: 100% Medium

What Do G2 Reviewers Say About SMACT?

AI-generated summary from verified user reviews

Pros
  • Users appreciate the ease of use of SMACT, especially for loading and viewing logic of xer files.
  • Users benefit from the time-saving features of SMACT, as it simplifies viewing and checking schedules efficiently.

What Are Recent G2 Reviews of SMACT?

TracTime

TracTime is a construction scheduling software that is designed to help manage projects by allowing you to stay informed and in control of project work and keep project teams aligned with reporting.

Average Rating: 3.5/5.0

Total Reviews: 1

Who Is the Company Behind TracTime?

Who Uses This Product?

  • Company Size: 100% Small

What Are G2 Users Discussing About TracTime?

1iQ

1iQ is construction scheduling and project tracking software for real estate developers, owners and the builders who work with them. It reads a schedule from Primavera P6, Microsoft Project or Excel, recalculates the critical path and runs the DCMA 14 point quality checks. Once the schedule is agreed, 1iQ keeps it as the baseline and tracks it against what really happens on site. The result is three dates side by side: the original plan, the working schedule and a forecast based on real progress. When something slips, you see what it does to the finish and what it costs.

Who Is the Company Behind 1iQ?

  • Seller: 1iQ
  • Year Founded: 2019
  • HQ Location: Playa Vista, US
  • LinkedIn® Page: www.linkedin.com
    1 employees on LinkedIn®

AI can help you find the answers. G2 helps you trust them.

Connect G2 to Claude or ChatGPT for answers grounded in G2's trusted reviews, comparisons, and pricing from real user insights.

How it works

4D Reconstruct

Reconstruct is the leader in remote quality control, progress monitoring, and facilities assessment. Our cutting-edge reality mapping technology empowers you to manage projects remotely, mitigate risk, save time and money, and make better decisions—all while slashing travel to the job site. Reconstruct is the only solution that allows you to truly visualize your project by combining reality capture, design, and construction schedule. And best of all, virtually anyone on the job site can conduct reality capture using equipment as simple as a smartphone or 360 camera.

Average Rating: 4.7/5.0

Total Reviews: 5

Who Is the Company Behind 4D Reconstruct?

Who Uses This Product?

  • Top Industries: Construction
  • Company Size: 60% Medium, 60% Small

What Are Recent G2 Reviews of 4D Reconstruct?

What Are G2 Users Discussing About 4D Reconstruct?

4PS Construct

ERP solution for construction, installation and infrastructure companies.

Who Is the Company Behind 4PS Construct?

  • Seller: 4PS
  • HQ Location: Ede, NL
  • LinkedIn® Page: www.linkedin.com
    572 employees on LinkedIn®

Alobees

Are you a small building contractor? Tired of communicating with paper, SMS, email...? Alobees lets you centralize information and communicate it in real time with your workers in the field. Planning, time tracking, photos... Alobees does it all in one place, without having to transcribe the information to a computer. Even better! Alobees lets you know if you need to recruit manpower to meet your deadlines, and prepares your employees' pay in 1 click.

Average Rating: 5.0/5.0

Total Reviews: 1

Who Is the Company Behind Alobees?

  • Seller: Alobees
  • Year Founded: 2017
  • HQ Location: Paris, FR
  • LinkedIn® Page: www.linkedin.com
    30 employees on LinkedIn®

Who Uses This Product?

  • Company Size: 100% Large

What Are Recent G2 Reviews of Alobees?

Aphex

Aphex is the first multiplayer scheduling software for construction delivery teams. It’s hard work coordinating your team with lookaheads in Excel, Daily Work Plans in Powerpoint and Reports in Word. Give your team one place to understand what they need to do on fastest way for construction teams to plan together.

Who Is the Company Behind Aphex?

  • Seller: Aphex
  • Year Founded: 2018
  • HQ Location: London, GB
  • LinkedIn® Page: www.linkedin.com
    54 employees on LinkedIn®

Archipad

Who Is the Company Behind Archipad?

  • Seller: Bigsool
  • Year Founded: 2011
  • HQ Location: Valbonne, FR
  • LinkedIn® Page: www.linkedin.com
    19 employees on LinkedIn®

Assemble

Assemble Systems provides a SaaS solution that enables construction professionals to condition, query and connect BIM data to key workflows including design reviews, takeoffs, estimating, change management, value engineering and schedule management. Instant Access to BIM: Provide the entire project team with access to the model and drawings in the cloud to quickly group, sort, and filter quantities and associated meta-data Instant Access to Quantities: Instant access to complete project inventory to easily organize project data by user defined parameters such as bid-package, locations, phase, WBS or Work Activity codes Improved Workflows: Leverage aggregated quantities by trade in Assemble for construction workflows including Work in Place (WIP), lookaheads, status tracking and inventory management

Average Rating: 4.3/5.0

Total Reviews: 85

Who Is the Company Behind Assemble?

  • Seller: Autodesk
  • Year Founded: 1982
  • HQ Location: San Francisco
  • LinkedIn® Page: www.linkedin.com
    15,757 employees on LinkedIn®
  • Ownership: NASDAQ:ADSK
  • Total Revenue (USD mm): $3,790

Who Uses This Product?

  • Who Uses This: VDC Manager, Estimator
  • Top Industries: Construction
  • Company Size: 55% Large, 41% Medium

What Do G2 Reviewers Say About Assemble?

AI-generated summary from verified user reviews

Pros
  • Users value the data extraction capabilities of Assemble, which enhance their workflow with added metadata.
  • Users value the ability to extract data from models and enrich it with metadata for enhanced insights.
Cons
  • Users feel the interface needs updates to better support larger models for improved usability.

What Are Recent G2 Reviews of Assemble?

Autodesk Forma (formerly Autodesk Construction Cloud)

Autodesk Forma (formerly Autodesk Construction Cloud) connects workflows, teams and data at every stage of construction to reduce risk, maximize efficiency, and increase profits. Autodesk Build is part of Autodesk Forma (formerly Autodesk Construction Cloud)'s newest set of products that further connect data, workflows, and teams throughout the entire building lifecycle. Build delivers a broad, deep, and connected set of field execution and project management tools for builders in a single software platform that is easy to deploy, adopt and use. Autodesk Build delivers the unification of best-in-class technology from PlanGrid and BIM 360, along with new functionality, to connect construction data and workflows across the headquarters, office, and jobsite. It offers tools for project management, quality, safety, cost, document management and project closeout workflows in a single application that is purpose-built for what you do and where you are working. -Supports integrated & digitized processes for the build phase of a project in a platform that is easy to deploy, adopt and use, while ensuring information sharing and workflows are tightly controlled and highly-configurable. -Standardized and centralized data collection from design through operations enables data-driven decision making, and predictive analytics provide visibility into high-risk issues that can impact project cost, schedule, quality, and safety. -Cloud-based document management provides a single source of truth for all project documentation for the owner, GCs and subs. Autodesk Takeoff empowers estimators to create fast, accurate takeoffs in a cloud-based solution that combines 2D and 3D workflows. Autodesk Takeoff is part of Autodesk Forma (formerly Autodesk Construction Cloud)'s newest set of products that further connect data, workflows, and teams throughout the entire building lifecycle. Autodesk Takeoff allows estimators to perform more accurate 2D takeoffs and generate automated quantities from 3D models in a single online solution. Preconstruction teams are empowered to win more work with integrated takeoffs and quantities that help produce quality estimates for faster, more accurate bidding. -Manage sheets and models in one data environment with Autodesk Docs -Easily capture project scope with linear, count and area takeoff -Generate multiple quantities and use custom formulas -Get instant access to quantities from models for automated 3D takeoffs -Access aggregated quantities from drawings and models Autodesk BIM Collaborate is part of Autodesk Forma (formerly Autodesk Construction Cloud)'s newest set of products that further connect data, workflows, and teams throughout the entire building lifecycle. BIM Collaborate empowers project teams to align and execute on design intent and constructability by managing the entire design collaboration and coordination workflow. Autodesk BIM Collaborate empowers design and construction teams to align and execute on design intent and constructability in a single online solution. By allowing teams to manage the entire design collaboration and coordination process in a single common data environment, BIM Collaborate reduces rework and improves overall design quality. -No limits on projects or file storage -Subscribe once and use on any project you are working on -Flexible subscription offerings for users, projects and businesses -Easily add subscribers and models as your business grows -Keep the same central administration and user login when adding new products

Average Rating: 4.4/5.0

Total Reviews: 5,481

Who Is the Company Behind Autodesk Forma (formerly Autodesk Construction Cloud)?

  • Seller: Autodesk
  • Company Website:
  • Year Founded: 1982
  • HQ Location: San Francisco
  • LinkedIn® Page: www.linkedin.com
    15,757 employees on LinkedIn®
  • Ownership: NASDAQ:ADSK

Who Uses This Product?

  • Who Uses This: BIM Manager, Project Manager
  • Top Industries: Construction, Architecture & Planning
  • Company Size: 45% Medium, 31% Large

What Do G2 Reviewers Say About Autodesk Forma (formerly Autodesk Construction Cloud)?

AI-generated summary from verified user reviews

Pros
  • Users value the ease of use in Autodesk Forma, enabling efficient collaboration and streamlined project management.
  • Users appreciate the seamless collaboration offered by Autodesk Forma, providing a centralized platform for effective project coordination.
  • Users value the enhanced team collaboration in Autodesk Forma, simplifying project coordination and ensuring everyone stays informed.
  • Users appreciate the collaboration capabilities of Autodesk Forma, enabling seamless coordination and visibility across project teams.
  • Users appreciate the easy access to Autodesk Forma's centralized platform, enhancing collaboration across teams and disciplines.
Cons
  • Users highlight the missing features of Autodesk Forma, such as limited customization and lack of essential PMO functionality.
  • Users face challenges with cost, usability, and flexibility, impacting their overall experience with Autodesk Forma.
  • Users face access limitations due to poor permission customization, complicating management and leading to user confusion.
  • Users find the lack of features in Autodesk Forma limiting customization and essential project management options.
  • Users find improvement needed in cost, usability, reliability, and flexibility of Autodesk Construction Cloud.

What Are Recent G2 Reviews of Autodesk Forma (formerly Autodesk Construction Cloud)?

What Are G2 Users Discussing About Autodesk Forma (formerly Autodesk Construction Cloud)?

BauMaster

BauMaster helps site managers, general contractors and construction professionals document and organise their projects efficiently. At its core is construction documentation: compliant records, site diaries and task lists are created directly on site – with practical text templates, photo documentation and drawing or BIM annotations. BauMaster also includes: • Construction scheduling for flexible trade coordination • Drawing server with integrated review workflow • BIM viewer for model-based working and BIM markers in records • Document management and digital construction file • Project and contact management • Defect management with photo documentation All features are unlimited – with no restrictions based on pricing tier. Sub contractors and clients collaborate free of charge, without registration. The flexible licence model allows licences to be freely combined – ideal for SMEs. Dedicated phone support comes as standard with BauMaster.

Who Is the Company Behind BauMaster?

Bauplaner

Bauplaner is construction planning software that organizes crew schedules and project timelines across multiple job sites. It provides a unified view where each site appears as a row and work packages are displayed as color-coded bars by trade, enabling managers to quickly assess crew assignments. The software generates scheduling proposals based on priorities, task sequencing, and crew availability, offering transparent reasoning for each decision. Conflicts like double bookings trigger alerts but leave final decisions to site managers. Bauplaner factors in holidays, absences, and closures when calculating schedules and exports finalized timelines as PDFs for internal use, crew distribution, or client sharing. An integrated Telegram assistant answers scheduling queries, records approved changes, and sends weekly digests summarizing assignments and alerts. Each business has an encrypted database instance, with servers in Germany and continuous backups.

Who Is the Company Behind Bauplaner?

Neya Kumaresan
NK
Researched and written by Neya Kumaresan
Updated October 3, 2024