# Which Google Workspace project management platforms offer multiple views for teams with different organizational preferences?

<p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">Different roles rarely want to view a project the same way. I’m researching tools that let designers, project managers, team leads, and executives use one workspace without forcing a single layout.</p><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true"><strong>Useful views often include:</strong></p><ul>
<li>Kanban or board</li>
<li>Gantt or timeline</li>
<li>Calendar</li>
<li>List or table</li>
<li>Workload or approval status</li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/hive-hive-hive/reviews"><strong>Hive</strong></a><strong>:</strong> Offers Kanban, Gantt, calendar, table, list, and note-based views.</li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/teamwork-com/reviews"><strong>Teamwork.com</strong></a><strong>:</strong> Includes list, board, timeline, and workload views.</li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/kanbanchi-for-google-workspace/reviews"><strong>Kanbanchi</strong></a><strong>:</strong> Moves between boards, Gantt charts, lists, checklists, and reports.</li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/reclaim-ai/reviews"><strong>Reclaim.ai</strong></a><strong>:</strong> Focuses on calendar and priority-based scheduling.</li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/collavate/reviews"><strong>Collavate</strong></a><strong>:</strong> Organizes work around document approval status.</li>
</ul><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">Which project view is non-negotiable for your team?</p>

##### Post Metadata
- Posted at: about 2 months ago
- Author title: Marketer
- Net upvotes: 1


## Comments
### Comment 1

Do the different views actually stay in sync with each other in real time, or does switching between them sometimes show a slightly different picture of the same project?

##### Comment Metadata
- Posted at: 3 days ago
- Author title: Marketing



### Comment 2

&lt;p&gt;I’d care less about how many views exist than whether they remain different representations of the same underlying work. A PM changing a deadline in Gantt should immediately change what the designer sees on the board and what the lead sees on the calendar. Once teams maintain separate information for each view, flexibility starts creating another synchronization problem.&lt;/p&gt;

##### Comment Metadata
- Posted at: 6 days ago
- Author title: Writer



### Comment 3

&lt;p&gt;Agreed the board is the default working view, and the one I&#39;d argue for alongside it is the calendar, specifically for cross-functional work. People commit to dates rather than columns, and seeing a deadline next to their actual meeting load is what makes a commitment realistic. Hive covering both in one workspace is the practical version of that.&lt;/p&gt;

##### Comment Metadata
- Posted at: 8 days ago
- Author title: Tech Consultant



### Comment 4

&lt;p&gt;For most cross-functional teams, the board or Kanban view ends up being the one that&#39;s actually non-negotiable, since it&#39;s the only layout that reads the same way to a designer, a PM, and an exec without any translation. I&#39;ve noticed that sentiment directly in reviews too: one CTO reviewing Kanbanchi said its simplicity and design made it the only digital Kanban board with real potential to replace the physical whiteboard his team had been using. Gantt and workload views tend to matter more for reporting upward, but the board is usually what people actually work from day to day.&lt;/p&gt;

##### Comment Metadata
- Posted at: about 2 months ago
- Author title: SEO Content Writer





## Related discussions
- [How well does Trello scale into a larger team?](https://www.g2.com/discussions/1-how-well-does-trello-scale-into-a-larger-team)
  - Posted at: over 13 years ago
  - Comments: 6
- [Can we please add a new section](https://www.g2.com/discussions/2-can-we-please-add-a-new-section)
  - Posted at: over 13 years ago
  - Comments: 0
- [Quantifiable benefits from implementing your CRM](https://www.g2.com/discussions/quantifiable-benefits-from-implementing-your-crm)
  - Posted at: over 13 years ago
  - Comments: 4


