# What&#39;s the most trusted advanced planning and scheduling software for operations managers at manufacturers based on user reviews?

<p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">Looking for input from G2 reviewers and operations managers, production planners, and plant managers in the <a class="a a--md" elv="true" href="https://www.g2.com/categories/advanced-planning-and-scheduling-aps">Advanced Planning and Scheduling category</a>, specifically from those who own the daily production schedule and can speak to which APS platform actually gets used by the production team rather than the one that looked most impressive in a vendor demo.</p><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">The platforms with the strongest operations manager trust evidence:</p><ul>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/mrpeasy/reviews"><strong>MRPeasy</strong></a>: The centralized tracking of inventory, production orders, and purchase activity in one place, replacing the combination of spreadsheets, whiteboards, and verbal scheduling that small manufacturers typically rely on, is described as the operational shift that makes the platform indispensable rather than optional. </li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/katana-mrp/reviews"><strong>Katana MRP</strong></a>: The automatic inventory deduction as production progresses keeps the stock record current without requiring production operators to manually log consumption at the end of each batch. The Shopify and WooCommerce integrations connect sales orders directly to production planning without manual order re-entry. </li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/infor-cloudsuite-industrial/reviews"><strong>Infor CloudSuite Industrial</strong></a>: Advanced scheduling with constraint-based optimisation is described as the trust model for mid-market discrete manufacturers whose production complexity requires more than first-come-first-served scheduling. The shop floor control module gives operations managers real-time visibility into work centre utilisation and job progress without requiring manual reporting from the floor. </li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/epicor-kinetic/reviews"><strong>Epicor Kinetic</strong></a>: Production scheduling integrated with purchasing, inventory, and financial modules in a single ERP environment is described as the operations manager trust model for mid-market manufacturers who need the scheduling system to be connected to the business rather than a standalone planning tool that requires manual synchronisation with the ERP. </li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/opcenter-aps/reviews"><strong>Opcenter APS</strong></a>: Finite capacity scheduling that optimises production sequences across multiple constraints simultaneously is described as the trust model for operations managers at complex, high-SKU manufacturers where manual scheduling produces suboptimal sequences that cost significant OEE. The what-if simulation capability is specifically valued for evaluating the production impact of a new customer order, a machine breakdown, or a material shortage before committing to a revised schedule. </li>
</ul><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">For operations managers who have replaced spreadsheet-based production scheduling with an APS platform, how long did it take from go-live before the production team was planning the schedule entirely within the system rather than maintaining a parallel spreadsheet as a fallback? And what was the scheduling scenario that the platform handled better than the spreadsheet approach from the very first week?</p>

##### Post Metadata
- Posted at: 6 days ago
- Author title: Marketing Executive
- Net upvotes: 1


## Comments
### Comment 1

&lt;p&gt;The parallel-spreadsheet question is a strong adoption test. I’d go one step further and ask what event finally made planners trust the system enough to stop maintaining that backup: a rush order, material shortage, machine outage, or major schedule change. If the APS can replan one of those situations and produce a schedule operators actually follow, that says much more than whether the initial production plan looks good.&lt;/p&gt;

##### Comment Metadata
- Posted at: 6 days ago
- Author title: Writer





## Related discussions
- [How well does Trello scale into a larger team?](https://www.g2.com/discussions/1-how-well-does-trello-scale-into-a-larger-team)
  - Posted at: over 13 years ago
  - Comments: 6
- [Can we please add a new section](https://www.g2.com/discussions/2-can-we-please-add-a-new-section)
  - Posted at: over 13 years ago
  - Comments: 0
- [Quantifiable benefits from implementing your CRM](https://www.g2.com/discussions/quantifiable-benefits-from-implementing-your-crm)
  - Posted at: over 13 years ago
  - Comments: 4