# What are the best construction accounting systems for contractors tracking job costs at the same pace as the work?

<p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">Hi, contractors and construction finance folks on G2, plus reviewers who have watched a job go wrong on paper a month after it went wrong in the field. I am looking for the best<a class="a a--md" elv="true" href="https://www.g2.com/categories/construction-accounting-software"> </a><a class="a a--md" elv="true" href="https://www.g2.com/categories/construction-accounting-software">construction accounting</a> systems for contractors tracking job costs at the same pace as the work, and would value input from people closing jobs rather than evaluating software.</p><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">Standard accounting reports on the month that finished. Construction needs the job that is still running, which means committed costs from purchase orders and subcontracts showing up before the invoices do. Three that come up most:</p><ul>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/deltek-computerease/reviews"><strong>Deltek ComputerEase</strong></a> (4.2) is built around real-time job costing by job, phase and cost code, with committed cost tracking and WIP reporting alongside construction payroll. Reviewers say the modules only connect properly when data is entered correctly at source, and some report a difficult period after the cloud migration.</li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/trimble-spectrum/reviews"><strong>Spectrum</strong></a> (4.2) and<a class="a a--md" elv="true" href="https://www.g2.com/products/trimble-vista/reviews"> </a><a class="a a--md" elv="true" href="https://www.g2.com/products/trimble-vista/reviews"><strong>Vista</strong></a> (4.0) are Trimble's two construction ERP systems, both widely reviewed by mid-size and larger contractors running job costing alongside project management.</li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/premier-construction-software/reviews"><strong>Premier Construction Software</strong></a> (4.7) carries the strongest rating of the construction-specific systems here, covering accounting and project management in one platform.</li>
</ul><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">For anyone running live job costing: how far behind the field is your cost data actually, once field time and supplier invoices catch up?</p><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true"></p><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true"></p>

##### Post Metadata
- Posted at: 8 days ago
- Author title: Tech Consultant
- Net upvotes: 1


## Comments
### Comment 1

&lt;p&gt;I’d want to know which cost inputs still lag in practice. Committed costs may update quickly, but if field time or supplier invoices arrive days later, the “real-time” job view can still leave finance reacting after the margin has already moved.&lt;/p&gt;

##### Comment Metadata
- Posted at: 6 days ago
- Author title: Marketer





## Related discussions
- [How well does Trello scale into a larger team?](https://www.g2.com/discussions/1-how-well-does-trello-scale-into-a-larger-team)
  - Posted at: over 13 years ago
  - Comments: 6
- [Can we please add a new section](https://www.g2.com/discussions/2-can-we-please-add-a-new-section)
  - Posted at: over 13 years ago
  - Comments: 0
- [Quantifiable benefits from implementing your CRM](https://www.g2.com/discussions/quantifiable-benefits-from-implementing-your-crm)
  - Posted at: over 13 years ago
  - Comments: 4


