# Which inventory management platforms are recommended for manufacturing work-in-progress tracking based on user reviews?

<p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">Looking for input from G2 reviewers and manufacturing operations teams in the <a class="a a--md" elv="true" href="https://www.g2.com/categories/inventory-management">Inventory Management category</a>, specifically from production managers and operations leads who need to track raw materials into WIP and WIP into finished goods at each production stage, where the gap between what the bill of materials says should have been consumed and what the system shows has actually been consumed is the daily accuracy problem.</p><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">The platforms with the strongest manufacturing WIP tracking evidence:</p><ul>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/katana-mrp/reviews"><strong>Katana MRP</strong></a>: Live production tracking from raw material through WIP to finished goods is the most specifically documented manufacturing capability in the category for small to mid-market manufacturers. The real-time production floor view showing which work orders are in progress, which materials have been consumed, and which orders are blocked by stock shortages is described as the operational visibility that replaces the spreadsheet-based WIP tracking most small manufacturers rely on before adopting a dedicated MRP. </li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/fishbowl-inventory/reviews"><strong>Fishbowl Inventory</strong></a>: Multilevel work orders, bills of materials, and manufacturer orders are specifically documented as the manufacturing WIP capabilities that make Fishbowl the step-up from Shopify inventory or QuickBooks for small manufacturers who have outgrown accounting-native inventory. </li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/cin7-core/reviews"><strong>Cin7 Core</strong></a>: Production orders with multi-level BOM explosion, raw material allocation, and finished goods receipt are described as the manufacturing WIP workflow for wholesale and light manufacturing operations managing inventory across production and distribution simultaneously. </li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/inflow-inventory/reviews"><strong>inFlow Inventory</strong></a>: Manufacturing orders with BOM-driven raw material deduction and finished goods receipt are described as the WIP tracking model for small manufacturers who need a step up from spreadsheet-based production tracking without investing in a full ERP. </li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/dear-systems/reviews"><strong>DEAR/Cin7 Omni</strong></a>: Production orders with multi-level BOMs, disassembly, and by-product tracking are described as the WIP capabilities that extend beyond simple assembly into more complex manufacturing scenarios. The integration between production, purchasing, and sales within the same platform means raw material purchase orders trigger against projected production demand rather than requiring a separate procurement workflow. </li>
</ul><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">For manufacturing operations managers who track WIP in their inventory system, what is the biggest discrepancy you have seen between the system's WIP valuation and the physical count at the end of a production run, and was it caused by a scanning gap, a BOM error, or a scrap/rework event the system did not capture?</p>

##### Post Metadata
- Posted at: 2 days ago
- Author title: Marketing Executive
- Net upvotes: 1


## Comments
### Comment 1

&lt;p&gt;Scrap and rework would be the discrepancy I’d watch most closely because both can make the system’s expected material consumption diverge from what actually happened on the floor. I’d want operators to record scrap, substitutions, and rework as they occur so WIP valuation updates with production reality rather than requiring finance or operations to reconcile everything at the end of the run.&lt;/p&gt;

##### Comment Metadata
- Posted at: 1 day ago





## Related discussions
- [How well does Trello scale into a larger team?](https://www.g2.com/discussions/1-how-well-does-trello-scale-into-a-larger-team)
  - Posted at: over 13 years ago
  - Comments: 6
- [Can we please add a new section](https://www.g2.com/discussions/2-can-we-please-add-a-new-section)
  - Posted at: over 13 years ago
  - Comments: 0
- [Quantifiable benefits from implementing your CRM](https://www.g2.com/discussions/quantifiable-benefits-from-implementing-your-crm)
  - Posted at: over 13 years ago
  - Comments: 4


