# Which takeoff platforms pass quantities into estimating without re-entering the numbers?

<p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">Measuring twice is the professional habit. Typing the same number twice is where the errors come from.</p><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">Question for the<a class="a a--md" elv="true" href="https://www.g2.com/categories/takeoff"> </a><a class="a a--md" elv="true" href="https://www.g2.com/categories/takeoff">takeoff</a> reviewers: which platforms genuinely carry quantities through to the estimate? Worth checking:</p><ul>
<li>Whether takeoff and estimating are one product or two that integrate</li>
<li>Whether a change to a measurement updates the estimate, or just the quantity</li>
<li>Whether assemblies exist for your trade or need building from scratch</li>
<li>Where the priced output ends up when it goes to the client</li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/stack-takeoff-estimate/reviews"><strong>STACK Takeoff &amp; Estimate</strong></a> keeps both in one platform, with assemblies and pricing built by the customer and a real-time view of the estimate updating during takeoff. Reviewers describe cutting out the paper-to-Excel-to-software-to-Excel loop entirely.</li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/constructconnect-on-screen-takeoff/reviews"><strong>On-Screen Takeoff</strong></a> pairs with Quick Bid, and reviewers call that handover seamless enough to remove separate price calculation.</li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/methvin/reviews"><strong>Methvin</strong></a> covers takeoff and estimating together and is well rated by smaller contractors.</li>
</ul><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">What still gets retyped in your process, and at which step?</p><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true"></p><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true"></p>

##### Post Metadata
- Posted at: 9 days ago
- Author title: Tech Consultant
- Net upvotes: 1


## Comments
### Comment 1

&lt;p&gt;The step that seems to survive even in these integrated setups is anything requiring judgment beyond the raw measurement, applying a waste factor, a site-specific labor adjustment, or a material substitution that the assembly wasn&#39;t built for. The quantity itself carries through cleanly, but the moment a number needs a human decision layered on top of it, someone tends to type that adjustment in manually rather than trusting the system&#39;s default assembly pricing, which is really a different problem than re-entering a measurement, it&#39;s re-entering judgment the software can&#39;t fully anticipate.&lt;/p&gt;

##### Comment Metadata
- Posted at: 6 days ago
- Author title: SEO Content Writer





## Related discussions
- [How well does Trello scale into a larger team?](https://www.g2.com/discussions/1-how-well-does-trello-scale-into-a-larger-team)
  - Posted at: over 13 years ago
  - Comments: 6
- [Can we please add a new section](https://www.g2.com/discussions/2-can-we-please-add-a-new-section)
  - Posted at: over 13 years ago
  - Comments: 0
- [Quantifiable benefits from implementing your CRM](https://www.g2.com/discussions/quantifiable-benefits-from-implementing-your-crm)
  - Posted at: over 13 years ago
  - Comments: 4


