As the HSE Director for BAT Construction, I'm directly involved in evaluating, configuring and implementing Wombat Safety Software for our construction operations.
We've been working with the Wombat development team to customize our daily pre-start inspections, field-level hazard assessments (FLHAs), hazard identification processes and critical control verification requirements.
One example is our work on an interactive FLHA that allows workers to identify hazards by energy source, select applicable work activities and identify associated controls. We're also developing a process to integrate fatal risk identification and task-specific critical control questions directly into the assessment.
What I like most is the Wombat team's willingness to work directly with us on these requirements. I've personally participated in reviewing workflows, identifying improvements and providing feedback on working prototypes. The team has been responsive to our requests and open to changing the system to better suit our field operations.
That level of collaboration and customization has been the biggest positive in our experience so far. Review collected by and hosted on G2.com.
Our implementation is still in progress, and the biggest challenge has been getting some of the workflows to operate as efficiently as we need them to in the field.
During our initial field pilot, we experienced usability challenges with the FLHA process, and some crews temporarily returned to paper assessments while we worked through improvements.
We've provided feedback on reducing the number of steps workers need to complete, improving hazard selection, simplifying the user interface and developing better supervisor review and approval functions. We're also working through requirements for offline access and carrying information forward between assessments.
These are important considerations for our company because our crews work in remote locations and perform high-risk activities where safety documentation needs to be practical and efficient.
The positive is that Wombat has been receptive to this feedback. However, we still need to complete further field testing before we can consider the implementation fully successful. Review collected by and hosted on G2.com.