
I love Productive—it’s such a great way to track projects all in one place. The agency I work at handles thousands of tasks each year, and being able to track everything accurately and stay ahead of the curve makes a huge difference. The UI is intuitive, everything is integrated in one spot, and it’s been consistently reliable for us. Review collected by and hosted on G2.com.
There are a few issues I have with productive. I would love if these would change.
1. Any time I start productive, it says "New updates are downloaded. Restart application to apply new changes". But if I restart it just crashes, and has showed this every time I've launched Productive for the past 2 months. Not a big deal, and I assume a clean install would fix this. Just thought I should flag incase it's a broader issue.
2. Time tracking could be better. Overall, it's solid. But I want blocks of time tracked time to click together better. I don't want things to overlap, or at least for there to be a button to select magnetic mode so things click together. In a tasks time tracked settings, I don't like when you have a time in the 'Time' box, and you shift the start time and it changes the 'Time' entry. Or vice versa, hard to explain but I would like to be able to input numbers into the time range, with it only affecting the time range when an in and out range is specified.
3. I would like to be able to zoom in vertically to the time tracking page. 8hrs only uses half the vertical space of the screen, it would be nice to be able to be closer to have more vertical space to work with when tracking time. I would be happy to scroll up and down.
4. I would like a fluid scroll left and right in the tasks 'workload' page. It only lets you scroll so far, I assume this is a loading issue as you don't want to pull all that data to optimise performance. But every now and then the split between pages is where my work day is, so to look at the previous day I have to click left and right on the 'Today' arrows to see between two days.
5. It would be so nice to be able to split workloads not by task, but by time. So in workload, if I had an 8hr task, if I dragged it over two days, it would automatically still do 4hr/4hr, but I could edit that and assign 6hr to day 1, 2hr to day 2.
6. It would be nice to be able to put blockers for tasks. Empty ghost projects that you could reassign later, but didn't affect the workload. Review collected by and hosted on G2.com.
Hi Alex,
Thank you so much for leaving an extensive review for us; it really means a ton! The only issue I can address right now is the Crashes. That has been fixed and just needs a reinstall. I've passed the full review to the team, and they will try to address each of your points :)
Thanks!