# Which Infor M3 resellers support phased implementations without halting production operations in regulated industries?

<p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">Phased implementation in a regulated manufacturing environment means something specific: production can't stop for a cutover window as it might in a less regulated setting, and each phase must pass its own validation before the next starts. Defining what "without halting production" actually requires matters more here than in most conversations with <a class="a a--md" elv="true" href="https://www.g2.com/categories/infor-m3-resellers"><strong>Infor M3 Resellers</strong></a>.</p><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true"><strong>What makes this worth settling carefully:</strong></p><ul>
<li>Whether the reseller has documented experience running phased go-lives specifically, rather than single-cutover implementations</li>
<li>How the reseller handles validation checkpoints between phases in a regulated environment</li>
<li>Whether the reseller's vertical experience includes regulated sectors like food and beverage specifically</li>
<li>What contingency plan exists if a phase needs to roll back without affecting production already live on earlier phases</li>
</ul><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">What the reviews actually show for each:</p><ul>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/athentis-consulting/reviews"><strong>Athentis Consulting</strong></a>: named depth in food and beverage, a regulated sector with its own compliance and traceability requirements, suggesting direct relevant experience with phased rollouts that can't interrupt a regulated production line.</li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/eoh-infor-services/reviews"><strong>EOH Infor Services</strong></a>: its scope explicitly includes governance as part of enterprise performance management, a detail that matters for regulated-industry phased rollouts where governance sign-off between phases is often a hard requirement.</li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/platned/reviews"><strong>Platned</strong></a>: built around a full lifecycle model, implementation through optimization and managed services, that structurally supports a phased approach even though its documented track record leans toward IFS rather than Infor M3 specifically.</li>
</ul><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">For manufacturers in a regulated sector that ran a phased M3 implementation with one of these resellers: did production actually stay uninterrupted through every phase, or was there at least one phase that required a planned downtime window despite the phased approach?</p>

##### Post Metadata
- Posted at: 12 days ago
- Net upvotes: 1


## Comments
### Comment 1

&lt;p&gt;In regulated manufacturing, I’d pay particular attention to how validation is built into each phase rather than treated as a final go-live exercise. That makes Athentis Consulting’s food and beverage experience especially relevant here. A phased rollout becomes much more meaningful when validation, traceability, and production continuity are planned together from the start.&lt;/p&gt;

##### Comment Metadata
- Posted at: 12 days ago
- Author title: Writer





## Related discussions
- [How well does Trello scale into a larger team?](https://www.g2.com/discussions/1-how-well-does-trello-scale-into-a-larger-team)
  - Posted at: over 13 years ago
  - Comments: 6
- [Can we please add a new section](https://www.g2.com/discussions/2-can-we-please-add-a-new-section)
  - Posted at: over 13 years ago
  - Comments: 0
- [Quantifiable benefits from implementing your CRM](https://www.g2.com/discussions/quantifiable-benefits-from-implementing-your-crm)
  - Posted at: over 13 years ago
  - Comments: 4


