
That you can link NC's to CAPAs or CF's to CAPAs. That it is one system for the whole QMS. Review collected by and hosted on G2.com.
For Procedures that have many attachments, it is very time consuming to check out every single attachment and upload it again within the system itself. Somethimes it takes 1 hour to upload all attachments to Greenlight Guru. Another problem for new attachments is that the revision number starts from 0 and doesn't match the revision number of the General Procedure anymore. We need to check out several times to match it to the GP which is very time consuming. We stopped doing it because of time efficiency reasons. We are also not able to electronically sign off documents within the system nor adjusting documents in the system as well. We are basically doing double work. We review and sign off in our server, add it in our document control list and then upload it to greenlight guru with a viewable pdf. The review round in the change control workspace doesn't even make sense for the procedures or work instructions. We face also difficulties sometimes with people being not able to download editable versions even though they have the correct rights. Review collected by and hosted on G2.com.