Verified User in Construction
UC
Verified User in Construction
Mid-Market (51-1000 emp.)
"Total project management software"
4.5/5
What do you like best about Asta?

The ability to completely customise the information on the programme and how it’s displayed. It’s easy to tailor the information and the display to client or internal requirements. Review collected by and hosted on G2.com.

What do you dislike about Asta?

There are certain parts of Powerproject that are very unwieldy. For example, when you want to create or edit custom columns of information in the spreadsheet, you need to save the file each time before each edit can be made. It can be OTT for small projects. Review collected by and hosted on G2.com.

Bill (William) S.
BS
Bill (William) S.
Open
Small-Business (50 or fewer emp.)
"Horses for courses"
2.5/5
What do you like best about Asta?

Graphics and BIM alignment make it ideal for construction projects that require a strong emphasis on stakeholder engagement Review collected by and hosted on G2.com.

What do you dislike about Asta?

My career experience has mainly been working with primavera, so I admit to bias. My ‘Gut’ feeling with Powerproject is that it has always been considered as old school and limited to construction contractor preference? Review collected by and hosted on G2.com.

Verified User in Construction
UC
Verified User in Construction
Small-Business (50 or fewer emp.)
"User-friendly"
5/5
What do you like best about Asta?

User interface, presentation of trade schedule, presentation of schedule to stakeholders, simplicity of the program. Undo and drag and drop options are exceptional. Easy claims/delay analysis Review collected by and hosted on G2.com.

What do you dislike about Asta?

Difficult to program complex schedules. Difficult to find resources online compared to P6. Review collected by and hosted on G2.com.

Verified User in Construction
UC
Verified User in Construction
Enterprise (> 1000 emp.)
"Asta Compared With P6"
4/5
What do you like best about Asta?

The ease of adding activities and adding links and logic. Review collected by and hosted on G2.com.

What do you dislike about Asta?

The Filter function is not as good as P6, for example, you cannot filter out 1 activity and then use the function "go-to" its predecessors and they show up on the screen each time leaving you a view of the path to one chosen activity. Also, the option to save layouts and export them to other users would be useful. Review collected by and hosted on G2.com.

Verified User in Construction
UC
Verified User in Construction
Enterprise (> 1000 emp.)
"User friendly and simple to use"
5/5
What do you like best about Asta?

Asta is easy to manipulate to show the relevant data to the relevant people. With views, layouts and particularly the hide function Review collected by and hosted on G2.com.

What do you dislike about Asta?

You cannot pause and restart activities like in primavera. Review collected by and hosted on G2.com.

Yarkin B.
YB
Yarkin B.
Managing Director
Enterprise (> 1000 emp.)
"Planner"
4.5/5
What do you like best about Asta?

It’s easy to manage, you can track the process easier. It’s simple to explain to the other management disciplines. Review collected by and hosted on G2.com.

What do you dislike about Asta?

Cost part of the app is quite confusing, also some basic information can’t be accessed easily. There should be a book or something. Review collected by and hosted on G2.com.

Verified User in Construction
UC
Verified User in Construction
Small-Business (50 or fewer emp.)
"Worked in Powerproiect throughout my Thesis"
3.5/5
What do you like best about Asta?

Connecting 3D model to the schedule in it Review collected by and hosted on G2.com.

What do you dislike about Asta?

Resources allocation process in the scheduling Review collected by and hosted on G2.com.

Abhishek R.
AR
Abhishek R.
Project Lead Scheduler
Enterprise (> 1000 emp.)
"Most visually appealing scheduling software."
4/5
What do you like best about Asta?

Visuals and reports. Ease of making logic ties Review collected by and hosted on G2.com.

What do you dislike about Asta?

Not many people use it. System crashes on large complex projects Review collected by and hosted on G2.com.

Verified User in Construction
UC
Verified User in Construction
Small-Business (50 or fewer emp.)
"Detailed algorithms"
4/5
What do you like best about Asta?

It's industry recognised, we've moved away from power project to Asta. Review collected by and hosted on G2.com.

What do you dislike about Asta?

It can be complicated to use, need assistance for a while and good training. Review collected by and hosted on G2.com.

Verified User in Construction
UC
Verified User in Construction
Mid-Market (51-1000 emp.)
"Best Programming Software Out There"
5/5
What do you like best about Asta?

It is very simple to use and update unlike another well known software I have used and easily customisable with colours for trades etc Review collected by and hosted on G2.com.

What do you dislike about Asta?

It can be quite difficult to link lines together to form a critical path Review collected by and hosted on G2.com.