# Autodesk Forma (formerly Autodesk Construction Cloud), PlanRadar vs Oracle Primavera Comparison

| | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Star Rating** | 4.4 out of 5 | 4.5 out of 5 | 4.4 out of 5 | 
| **Total Reviews** | 5,381 | 69 | 385 | 
| **Largest Market Segment** | Mercato Medio (45.4% delle recensioni) | Piccola Impresa (54.4% delle recensioni) | Impresa (38.3% delle recensioni) | 
| **Entry Level Price** | A partire da $500.00 All'anno | $35.00 1 Users Al mese | Nessun prezzo disponibile | 

---
## Top Pros & Cons

### Autodesk Forma (formerly Autodesk Construction Cloud)

Pros:
- Ease of Use (556 reviews)
- Collaboration (493 reviews)

Cons:
- Missing Features (511 reviews)
- Access Limitations (337 reviews)

### PlanRadar

Pros:
- Ease of Use (46 reviews)
- Reporting (32 reviews)

Cons:
- Slow Performance (14 reviews)
- Limited Customization (9 reviews)

### Oracle Primavera

Pros:
- Project Management (2 reviews)
- Centralization (1 reviews)

Cons:
- Complex Setup (1 reviews)
- Cost Issues (1 reviews)

---
## Ratings Comparison
| Rating | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
  | **Soddisfa i requisiti** | 8.2 (3769 reviews) | 8.9 (65 reviews) | 8.8 (260 reviews) | 
  | **Facilità d&#39;uso** | 8.1 (4686 reviews) | 8.8 (67 reviews) | 7.7 (262 reviews) | 
  | **Facilità di configurazione** | 7.9 (3527 reviews) | 8.4 (65 reviews) | 7.3 (94 reviews) | 
  | **Facilità di amministrazione** | 7.9 (1880 reviews) | 9.0 (26 reviews) | 7.8 (94 reviews) | 
  | **Qualità del supporto** | 8.0 (3428 reviews) | 8.8 (62 reviews) | 7.7 (247 reviews) | 
  | **Ritiene che the product sia stato un valido partner commerciale?** | 8.3 (1836 reviews) | 9.0 (24 reviews) | 8.0 (94 reviews) | 
  | **Direzione del prodotto (% positivo)** | 9.1 (3762 reviews) | 9.3 (67 reviews) | 7.9 (236 reviews) | 

---
## Pricing

### Autodesk Forma (formerly Autodesk Construction Cloud)

#### Entry-Level Pricing

Plan: Autodesk Docs

Price: A partire da $500.00 All&#39;anno

Description: Autodesk® Docs è un ambiente comune di gestione documentale basato su cloud in Autodesk Construction Cloud. Con Autodesk Docs, puoi:

Key Features:
- Migliora l&#39;accuratezza riducendo errori e rifacimenti
- Ottimizza i flussi di lavoro di revisione e approvazione
- Allinea i membri del team e rendi più facile la pianificazione del progetto

[Browse all 4 editions](https://www.g2.com/it/products/autodesk-forma-formerly-autodesk-construction-cloud/pricing)

#### Free Trial

Yes

### PlanRadar

#### Entry-Level Pricing

Plan: Basic

Price: $35.00 1 Users Al mese

Key Features:
- Unlimited Subcontractors &amp; Watchers
- 10 Digital Plans
- Basic Report Template

[Browse all 4 editions](https://www.g2.com/it/products/planradar/pricing)

#### Free Trial

Yes

### Oracle Primavera

#### Entry-Level Pricing

No pricing available

#### Free Trial

No information available

---
## Features Comparison By Category

### Gestione di Progetti e Portafogli

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | N/A | N/A |
| **PlanRadar** | N/A | N/A |
| **Oracle Primavera** | 8.2/10 | 94 |

#### Gestione del portafoglio

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Tipi di portafoglio** | Dati insufficienti | Dati insufficienti | 8.1 (68 reviews) ✓ Verified | 
| **Pianificazione** | Dati insufficienti | Dati insufficienti | 8.8 (73 reviews) ✓ Verified | 
| **Allineamento** | Dati insufficienti | Dati insufficienti | 8.2 (65 reviews) ✓ Verified | 
| **Mix di portafoglio** | Dati insufficienti | Dati insufficienti | 7.8 (60 reviews) ✓ Verified | 

#### Gestione del Progetto

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Dipendenze** | Dati insufficienti | Dati insufficienti | 8.6 (72 reviews) ✓ Verified | 
| **Priorità** | Dati insufficienti | Dati insufficienti | 8.6 (69 reviews) ✓ Verified | 
| **Gestione snella** | Dati insufficienti | Dati insufficienti | 7.9 (62 reviews) ✓ Verified | 

#### Gestione delle Risorse

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Definizione** | Dati insufficienti | Dati insufficienti | 8.4 (78 reviews) ✓ Verified | 
| **Allocazione** | Dati insufficienti | Dati insufficienti | 8.3 (76 reviews) ✓ Verified | 
| **Ottimizzazione** | Dati insufficienti | Dati insufficienti | 8.4 (75 reviews) ✓ Verified | 

#### Dati e Analisi

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Consolidamento dei dati** | Dati insufficienti | Dati insufficienti | 8.0 (67 reviews) ✓ Verified | 
| **Visualizzazioni** | Dati insufficienti | Dati insufficienti | 7.7 (71 reviews) ✓ Verified | 
| **Prestazione** | Dati insufficienti | Dati insufficienti | 8.2 (71 reviews) ✓ Verified | 
| **Analisi del Rischio** | Dati insufficienti | Dati insufficienti | 7.3 (69 reviews) ✓ Verified | 

#### Strategia - Gestione di Progetti e Portafoglio

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Simulazione** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Tracciamento** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Pianificazione** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Obiettivi** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Visibilità** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Allineamento** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Gestione del Rischio** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Implementazione** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Ottimizzazione** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Prioritizzazione** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 

### Gestione delle Offerte

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | 7.0/10 | 509 |
| **PlanRadar** | N/A | N/A |
| **Oracle Primavera** | N/A | N/A |

#### Gestione Documentale

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Creazione di Proposte - Gestione delle Offerte** | 6.9 (477 reviews) | Dati insufficienti | Dati insufficienti | 
| **Confronti delle Offerte - Gestione delle Offerte** | 6.9 (475 reviews) | Dati insufficienti | Dati insufficienti | 
| **Modelli - Gestione delle Offerte** | 6.9 (468 reviews) | Dati insufficienti | Dati insufficienti | 
| **Inviti a Offrire - Gestione delle Offerte** | 6.8 (469 reviews) | Dati insufficienti | Dati insufficienti | 

#### Qualifiche

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Database dei Contatti - Gestione delle Offerte** | 7.0 (460 reviews) | Dati insufficienti | Dati insufficienti | 
| **Conformità - Gestione delle Offerte** | 6.9 (458 reviews) | Dati insufficienti | Dati insufficienti | 
| **Database Contatti - Gestione Offerte** | 7.0 (456 reviews) | Dati insufficienti | Dati insufficienti | 

#### Gestione della Costruzione

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Integrazione del Software di Costruzione - Gestione delle Offerte** | 7.3 (463 reviews) | Dati insufficienti | Dati insufficienti | 
| **Dati Storici - Gestione delle Offerte** | 7.2 (466 reviews) | Dati insufficienti | Dati insufficienti | 
| **Gestione del Progetto - Gestione delle Offerte** | 7.4 (467 reviews) | Dati insufficienti | Dati insufficienti | 

### Gestione dei Costi di Progetto

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | N/A | N/A |
| **PlanRadar** | N/A | N/A |
| **Oracle Primavera** | 8.5/10 | 114 |

#### Monitoraggio dei costi

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Identificazione** | Dati insufficienti | Dati insufficienti | 8.5 (97 reviews) | 
| **Allocazione** | Dati insufficienti | Dati insufficienti | 8.4 (98 reviews) | 
| **Costi standard** | Dati insufficienti | Dati insufficienti | 8.6 (96 reviews) | 

### Gestione dei Progetti Capitali

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | N/A | N/A |
| **PlanRadar** | N/A | N/A |
| **Oracle Primavera** | 8.3/10 | 80 |

#### Pianificazione

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Bilancio** | Dati insufficienti | Dati insufficienti | 8.3 (62 reviews) | 
| **Ambito** | Dati insufficienti | Dati insufficienti | 8.4 (63 reviews) | 
| **Programma** | Dati insufficienti | Dati insufficienti | 8.8 (65 reviews) | 

#### Gestione

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Flussi di lavoro** | Dati insufficienti | Dati insufficienti | 8.1 (59 reviews) | 
| **Controllo dei costi** | Dati insufficienti | Dati insufficienti | 8.2 (60 reviews) | 
| **Documenti** | Dati insufficienti | Dati insufficienti | 7.9 (56 reviews) | 

### Elenco dei lavori da completare

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | 7.8/10 | 373 |
| **PlanRadar** | 8.4/10 | 13 |
| **Oracle Primavera** | N/A | N/A |

#### Documentazione

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Integrazione del Software di Ispezione di Terze Parti** | 6.8 (341 reviews) | 8.2 (10 reviews) | Dati insufficienti | 
| **Caricamenti di allegati** | 8.6 (365 reviews) | 8.8 (11 reviews) | Dati insufficienti | 
| **Modelli** | 7.9 (364 reviews) | 8.3 (11 reviews) | Dati insufficienti | 
| **Generazione di elenchi** | 7.8 (349 reviews) | 7.7 (11 reviews) | Dati insufficienti | 
| **Reportistica e Analisi** | 7.7 (357 reviews) | 8.6 (11 reviews) | Dati insufficienti | 

#### Collaborazione

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Cronologia delle azioni** | 8.3 (354 reviews) | 8.2 (11 reviews) | Dati insufficienti | 
| **Notifiche e Promemoria** | 7.7 (356 reviews) | 7.9 (11 reviews) | Dati insufficienti | 
| **Messaggistica e Comunicazione** | 7.7 (348 reviews) | 8.5 (11 reviews) | Dati insufficienti | 
| **Supporto Mobile** | 7.7 (354 reviews) | 8.2 (11 reviews) | Dati insufficienti | 

### Gestione del Cantiere

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | 7.7/10 | 397 |
| **PlanRadar** | 8.3/10 | 89 |
| **Oracle Primavera** | N/A | N/A |

#### Gestione del campo

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Collaborazione sul campo** | 8.5 (386 reviews) | 8.6 (50 reviews) | Dati insufficienti | 
| **Coordinamento sul campo** | 8.3 (385 reviews) | 8.0 (46 reviews) | Dati insufficienti | 
| **Conformità alla Sicurezza** | 7.9 (372 reviews) | 8.3 (46 reviews) | Dati insufficienti | 
| **Comunicazione sul campo** | 8.3 (382 reviews) | 8.1 (48 reviews) | Dati insufficienti | 
| **Pianificazione della forza lavoro** | 7.0 (365 reviews) | 8.2 (49 reviews) | Dati insufficienti | 

#### Gestione degli asset

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Gestione delle Risorse** | 7.4 (357 reviews) | 8.3 (45 reviews) | Dati insufficienti | 
| **Fogli di presenza** | 6.3 (344 reviews) | 7.6 (44 reviews) | Dati insufficienti | 
| **Tracciamento Visivo dei Progetti** | 7.9 (356 reviews) | 8.6 (45 reviews) | Dati insufficienti | 
| **Segnalazione** | 7.7 (363 reviews) | 8.8 (47 reviews) | Dati insufficienti | 

### Software di valutazione del rischio di costruzione

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | 7.3/10 | 71 |
| **PlanRadar** | N/A | N/A |
| **Oracle Primavera** | N/A | N/A |

#### Gestione della Sicurezza sul Lavoro

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Tracciamento degli Incidenti sul Lavoro** | 7.6 (65 reviews) | Dati insufficienti | Dati insufficienti | 
| **Formazione e Certificazioni** | 7.2 (64 reviews) | Dati insufficienti | Dati insufficienti | 
| **Documentazione fotografica** | 8.2 (66 reviews) | Dati insufficienti | Dati insufficienti | 
| **Gestione della Sicurezza** | 7.8 (65 reviews) | Dati insufficienti | Dati insufficienti | 

#### Gestione della Sicurezza Operativa

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Analisi IoT** | 6.5 (60 reviews) | Dati insufficienti | Dati insufficienti | 
| **Reportistica e cruscotti** | 7.9 (62 reviews) | Dati insufficienti | Dati insufficienti | 
| **Analisi Predittiva** | 7.2 (63 reviews) | Dati insufficienti | Dati insufficienti | 
| **Gestione del Rischio** | 7.5 (61 reviews) | Dati insufficienti | Dati insufficienti | 

#### Gestione della Sicurezza Logistica

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Tecnologia Mobile** | 7.8 (60 reviews) | Dati insufficienti | Dati insufficienti | 
| **Integrazione di Prequalificazione** | 7.0 (60 reviews) | Dati insufficienti | Dati insufficienti | 
| **Conformità alle Normative** | 7.3 (61 reviews) | Dati insufficienti | Dati insufficienti | 
| **Integrazione della Gestione dei Progetti** | 7.6 (62 reviews) | Dati insufficienti | Dati insufficienti | 

### Prequalificazione

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | 7.6/10 | 62 |
| **PlanRadar** | N/A | N/A |
| **Oracle Primavera** | N/A | N/A |

#### Gestione delle Operazioni

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Gestione del Rischio** | 7.2 (59 reviews) | Dati insufficienti | Dati insufficienti | 
| **Directory** | 7.7 (59 reviews) | Dati insufficienti | Dati insufficienti | 
| **Moduli di Prequalificazione Personalizzati** | 7.6 (58 reviews) | Dati insufficienti | Dati insufficienti | 
| **Integrazione con i moduli di prequalificazione** | 7.6 (57 reviews) | Dati insufficienti | Dati insufficienti | 
| **Gestione dei Subappaltatori** | 7.7 (57 reviews) | Dati insufficienti | Dati insufficienti | 
| **Invita a Offrire** | 7.8 (58 reviews) | Dati insufficienti | Dati insufficienti | 

### Gestione dei Progetti di Costruzione

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | 7.5/10 | 1252 |
| **PlanRadar** | N/A | N/A |
| **Oracle Primavera** | 7.9/10 | 136 |

#### Gestione delle attività

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Integrazioni degli Strumenti di Contabilità per le Costruzioni** | 7.0 (1058 reviews) | Dati insufficienti | 7.9 (78 reviews) | 
| **Integrazione dello Strumento di Stima delle Costruzioni** | 6.7 (1039 reviews) | Dati insufficienti | 8.0 (80 reviews) | 
| **Integrazione dello Strumento di Gestione della Forza Lavoro nella Costruzione** | 7.2 (1043 reviews) | Dati insufficienti | 8.1 (83 reviews) | 
| **Monitoraggio del Progetto** | 7.9 (1105 reviews) | Dati insufficienti | 8.8 (111 reviews) | 
| **Gestione delle informazioni** | 8.6 (1167 reviews) | Dati insufficienti | 8.2 (96 reviews) | 
| **Comunicazione e Collaborazione** | 8.7 (1180 reviews) | Dati insufficienti | 7.8 (90 reviews) | 

#### Gestione del sito

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Gestione dei servizi sul campo** | 7.4 (1054 reviews) | Dati insufficienti | 7.9 (92 reviews) | 
| **Collaborazione sul campo** | 7.9 (1092 reviews) | Dati insufficienti | 7.9 (89 reviews) | 
| **App mobile** | 7.2 (1108 reviews) | Dati insufficienti | 6.9 (63 reviews) | 
| **Rapporti sul campo** | 7.6 (1067 reviews) | Dati insufficienti | 8.1 (95 reviews) | 
| **Fogli di presenza** | 6.2 (1004 reviews) | Dati insufficienti | 8.2 (80 reviews) | 
| **Caricamenti di Foto e Video** | 7.9 (1097 reviews) | Dati insufficienti | 6.8 (67 reviews) | 
| **Pianificazione della forza lavoro** | 6.7 (1015 reviews) | Dati insufficienti | 8.6 (99 reviews) | 

### Stima dei Costi di Costruzione

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | 7.3/10 | 213 |
| **PlanRadar** | N/A | N/A |
| **Oracle Primavera** | N/A | N/A |

#### Gestione del flusso di lavoro

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Generazione di Proposte** | 7.1 (198 reviews) | Dati insufficienti | Dati insufficienti | 
| **Integrazioni** | 7.7 (200 reviews) | Dati insufficienti | Dati insufficienti | 

#### Calcolo dei costi del lavoro

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Accesso ai database dei costi** | 7.1 (199 reviews) | Dati insufficienti | Dati insufficienti | 
| **Digitalizzazione delle quantità** | 7.5 (197 reviews) | Dati insufficienti | Dati insufficienti | 
| **Struttura di Suddivisione del Lavoro (WBS)** | 7.1 (199 reviews) | Dati insufficienti | Dati insufficienti | 

### Gestione del Valore Acquisito

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | N/A | N/A |
| **PlanRadar** | N/A | N/A |
| **Oracle Primavera** | 8.5/10 | 97 |

#### Valore Acquisito

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Linea di base** | Dati insufficienti | Dati insufficienti | 8.8 (78 reviews) | 
| **Calcoli** | Dati insufficienti | Dati insufficienti | 8.8 (78 reviews) | 
| **Migliori Pratiche** | Dati insufficienti | Dati insufficienti | 8.4 (75 reviews) | 

#### Prestazione

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Importa dati** | Dati insufficienti | Dati insufficienti | 8.1 (76 reviews) | 
| **Valore Pianificato** | Dati insufficienti | Dati insufficienti | 8.9 (79 reviews) | 
| **Indicatori Chiave di Prestazione** | Dati insufficienti | Dati insufficienti | 8.7 (75 reviews) | 
| **Analisi della varianza** | Dati insufficienti | Dati insufficienti | 8.7 (75 reviews) | 

#### Integrazione

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Gestione del Progetto** | Dati insufficienti | Dati insufficienti | 8.6 (67 reviews) | 
| **PPM** | Dati insufficienti | Dati insufficienti | 8.2 (62 reviews) | 
| **Finanza** | Dati insufficienti | Dati insufficienti | 7.8 (56 reviews) | 

### Gestione dei Disegni di Costruzione

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | 8.0/10 | 1681 |
| **PlanRadar** | N/A | N/A |
| **Oracle Primavera** | N/A | N/A |

#### Gestione Documentale

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Piattaforma centralizzata** | 8.8 (1613 reviews) | Dati insufficienti | Dati insufficienti | 
| **Versionamento** | 8.6 (1605 reviews) | Dati insufficienti | Dati insufficienti | 
| **Gestione Documentale** | 8.9 (1625 reviews) | Dati insufficienti | Dati insufficienti | 
| **Tecnologia di Riconoscimento Ottico dei Caratteri (OCR)** | 7.2 (1524 reviews) | Dati insufficienti | Dati insufficienti | 
| **Collegamento** | 7.9 (1548 reviews) | Dati insufficienti | Dati insufficienti | 

#### Gestione del sito

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Monitoraggio dei progressi del sito** | 7.4 (1529 reviews) | Dati insufficienti | Dati insufficienti | 
| **Accesso Mobile** | 7.5 (1576 reviews) | Dati insufficienti | Dati insufficienti | 

### Analisi dei dati di costruzione

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | 7.7/10 | 415 |
| **PlanRadar** | N/A | N/A |
| **Oracle Primavera** | N/A | N/A |

#### Gestione dei dati

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Archiviazione Cloud** | 8.8 (387 reviews) | Dati insufficienti | Dati insufficienti | 
| **Consolidamento dei dati** | 8.4 (379 reviews) | Dati insufficienti | Dati insufficienti | 
| **Reportistica del cruscotto** | 7.8 (383 reviews) | Dati insufficienti | Dati insufficienti | 
| **Fonte Dati Agnostica** | 7.5 (361 reviews) | Dati insufficienti | Dati insufficienti | 
| **Raccolta automatizzata dei dati** | 7.7 (368 reviews) | Dati insufficienti | Dati insufficienti | 
| **Analisi dei dati pre-costruzione** | 7.4 (368 reviews) | Dati insufficienti | Dati insufficienti | 
| **Analisi dei dati post-costruzione** | 7.6 (363 reviews) | Dati insufficienti | Dati insufficienti | 
| **Generazione del rapporto** | 7.6 (371 reviews) | Dati insufficienti | Dati insufficienti | 

#### Gestione del sito

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Gestione del Rischio e della Sicurezza** | 7.3 (368 reviews) | Dati insufficienti | Dati insufficienti | 
| **Gestione delle Risorse** | 7.3 (364 reviews) | Dati insufficienti | Dati insufficienti | 
| **Tracciamento e Ottimizzazione delle Risorse** | 7.5 (363 reviews) | Dati insufficienti | Dati insufficienti | 

### Decollo

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | 7.6/10 | 229 |
| **PlanRadar** | N/A | N/A |
| **Oracle Primavera** | N/A | N/A |

#### Raccolta dati

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Calcolatori di costo** | Funzionalità non disponibile | Dati insufficienti | Dati insufficienti | 
| **Ricerca aziendale** | 7.5 (210 reviews) | Dati insufficienti | Dati insufficienti | 
| **Formati di input multipli** | 8.1 (216 reviews) | Dati insufficienti | Dati insufficienti | 

#### Generazione di Offerte

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Modifica Collaborativa** | 8.0 (213 reviews) | Dati insufficienti | Dati insufficienti | 
| **BoQ e BoM automatizzati** | 6.9 (210 reviews) | Dati insufficienti | Dati insufficienti | 
| **Versionamento** | 8.0 (211 reviews) | Dati insufficienti | Dati insufficienti | 
| **Integrazione con il software di stima** | 7.0 (207 reviews) | Dati insufficienti | Dati insufficienti | 

### Pianificazione della costruzione

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | N/A | N/A |
| **PlanRadar** | N/A | N/A |
| **Oracle Primavera** | N/A | N/A |

#### Pianificazione dei Flussi di Lavoro - Pianificazione della Costruzione

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Permessi utente** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Tracciamento del tempo** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Gestione del calendario** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Diagrammi di Gantt** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 

#### Reportistica e Analisi - Pianificazione della Costruzione

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Pianificazione degli scenari** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Reportistica di Progetto** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Gestione di base** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 

#### Produttività - Pianificazione della Costruzione

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Integrazioni di Stack di Costruzione** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Capacità mobili** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Strumenti di comunicazione** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 

### Gestione Strategica del Portafoglio

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | N/A | N/A |
| **PlanRadar** | N/A | N/A |
| **Oracle Primavera** | N/A | N/A |

#### Pianificazione Strategica - Gestione del Portafoglio Strategico

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Obiettivi** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Tabella di marcia** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Gestione della domanda** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Pianificazione delle risorse** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Pianificazione** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Simulazione** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Prioritizzazione** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Allineamento** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 

#### Gestione Strategica - Gestione del Portafoglio Strategico

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Visibilità** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Tracciamento** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Gestione del rischio** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Implementazione** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Gestione del cambiamento** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Ottimizzazione** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Modello di Strategia** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Frameworks** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 

#### Analisi dei Dati - Gestione Strategica del Portafoglio

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Impatto ESG** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Prestazioni finanziarie** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Previsione** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 

#### Intelligenza Artificiale - Gestione Strategica del Portafoglio

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Intelligenza di Processo** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Intuizioni Predittive** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 
| **Agenti Virtuali** | Dati insufficienti | Dati insufficienti | Dati insufficienti | 

### Partner di Integrazione di Autodesk Construction Cloud

| Product | Score | Reviews |
|---|---|---|
| **Autodesk Forma (formerly Autodesk Construction Cloud)** | 6.8/10 | 12 |
| **PlanRadar** | N/A | N/A |
| **Oracle Primavera** | N/A | N/A |

#### Agentic AI - Partner di integrazione di Autodesk Construction Cloud

| Feature | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Esecuzione autonoma dei compiti** | 6.5 (10 reviews) | Dati insufficienti | Dati insufficienti | 
| **Integrazione tra sistemi** | 7.4 (12 reviews) | Dati insufficienti | Dati insufficienti | 
| **Assistenza Proattiva** | 6.4 (7 reviews) | Dati insufficienti | Dati insufficienti | 

---
## Categories

**Unique to Autodesk Forma (formerly Autodesk Construction Cloud) (11):** [Decollo Software](https://www.g2.com/it/categories/takeoff), [Software di Prequalificazione](https://www.g2.com/it/categories/prequalification), [Software di gestione dei progetti di costruzione](https://www.g2.com/it/categories/construction-project-management), [Software di valutazione del rischio di costruzione](https://www.g2.com/it/categories/construction-risk-assessment-software), [Software di gestione del cantiere](https://www.g2.com/it/categories/jobsite-management), [Gestione dei Disegni di Costruzione Software](https://www.g2.com/it/categories/construction-drawing-management), [Software di analisi dei dati di costruzione](https://www.g2.com/it/categories/construction-data-analytics), [Software per lista di controllo](https://www.g2.com/it/categories/punch-list), [Partner di Integrazione di Autodesk Construction Cloud](https://www.g2.com/it/categories/autodesk-construction-cloud-integration-partners), [Software di gestione delle offerte](https://www.g2.com/it/categories/bid-management), [Software di stima dei costi di costruzione](https://www.g2.com/it/categories/construction-estimating-software)

**Unique to PlanRadar (2):** [Software di gestione del cantiere](https://www.g2.com/it/categories/jobsite-management), [Software per lista di controllo](https://www.g2.com/it/categories/punch-list)

**Unique to Oracle Primavera (7):** [Software di gestione del valore guadagnato](https://www.g2.com/it/categories/earned-value-management), [Software di gestione dei progetti capitali](https://www.g2.com/it/categories/capital-project-management), [Gestione dei Costi di Progetto Software](https://www.g2.com/it/categories/project-cost-management), [Software di gestione progetti e portafoglio](https://www.g2.com/it/categories/project-and-portfolio-management), [Software di gestione dei progetti di costruzione](https://www.g2.com/it/categories/construction-project-management), [Software di pianificazione della costruzione](https://www.g2.com/it/categories/construction-scheduling), [Software di Gestione Strategica del Portafoglio](https://www.g2.com/it/categories/strategic-portfolio-management)


---
## Reviewer Demographics

### By Company Size

| Segment | Autodesk Forma (formerly Autodesk Construction Cloud) | PlanRadar | Oracle Primavera | 
|---|---|---|---|
| **Piccola impresa** | 23.8% | 54.4% | 24.5% | 
| **Mid-Market** | 45.4% | 39.7% | 37.2% | 
| **Enterprise** | 30.8% | 5.9% | 38.3% | 

### By Industry

#### Autodesk Forma (formerly Autodesk Construction Cloud)

- **Costruzione:** 39.8%
- **Architettura e Pianificazione:** 23.0%
- **Ingegneria Civile:** 9.6%
- **Ingegneria Meccanica o Industriale:** 5.4%
- **Designa:** 3.8%
- **Consulenza:** 2.6%
- **Produzione Elettrica/Elettronica:** 1.4%
- **Petrolio e Energia:** 1.1%
- **Utilità:** 0.9%
- **Produzione:** 0.9%
- **Other:** 11.6%

#### PlanRadar

- **Costruzione:** 38.2%
- **Consulenza:** 11.8%
- **Architettura e Pianificazione:** 4.4%
- **Ingegneria Civile:** 4.4%
- **Software per computer:** 4.4%
- **Servizi di strutture:** 4.4%
- **Tecnologia dell&#39;informazione e servizi:** 2.9%
- **Contabilità:** 1.5%
- **Abbigliamento e Moda:** 1.5%
- **Automobilistico:** 1.5%
- **Other:** 25.0%

#### Oracle Primavera

- **Costruzione:** 51.5%
- **Petrolio e Energia:** 11.5%
- **Ingegneria Civile:** 7.9%
- **Tecnologia dell&#39;informazione e servizi:** 2.1%
- **Ingegneria Meccanica o Industriale:** 2.1%
- **Telecomunicazioni:** 1.8%
- **Architettura e Pianificazione:** 1.8%
- **Istruzione Superiore:** 1.8%
- **Consulenza di gestione:** 1.2%
- **Servizi Finanziari:** 1.2%
- **Other:** 17.4%

---
## Alternatives

### Alternatives to Autodesk Forma (formerly Autodesk Construction Cloud)

- [Procore](https://www.g2.com/it/products/procore/reviews) — 4.6/5 stars (4166 reviews)
- [Fieldwire by Hilti](https://www.g2.com/it/products/fieldwire-by-hilti/reviews) — 4.5/5 stars (531 reviews)
- [Bluebeam](https://www.g2.com/it/products/bluebeam/reviews) — 4.5/5 stars (461 reviews)
- [Newforma Project Center](https://www.g2.com/it/products/newforma-project-center/reviews) — 4.2/5 stars (144 reviews)
- [Touchplan](https://www.g2.com/it/products/touchplan/reviews) — 4.3/5 stars (199 reviews)
- [Dalux](https://www.g2.com/it/products/dalux/reviews) — 4.6/5 stars (176 reviews)
- [Oracle Aconex](https://www.g2.com/it/products/oracle-aconex/reviews) — 4.5/5 stars (231 reviews)
- [Revizto](https://www.g2.com/it/products/revizto/reviews) — 4.6/5 stars (209 reviews)
- [Buildertrend](https://www.g2.com/it/products/buildertrend/reviews) — 4.2/5 stars (180 reviews)
- [Simpro](https://www.g2.com/it/products/simpro/reviews) — 4.1/5 stars (398 reviews)

### Alternatives to PlanRadar

- [Procore](https://www.g2.com/it/products/procore/reviews) — 4.6/5 stars (4166 reviews)
- [Fieldwire by Hilti](https://www.g2.com/it/products/fieldwire-by-hilti/reviews) — 4.5/5 stars (531 reviews)
- [Bluebeam](https://www.g2.com/it/products/bluebeam/reviews) — 4.5/5 stars (461 reviews)
- [HCSS](https://www.g2.com/it/products/hcss/reviews) — 4.6/5 stars (251 reviews)
- [Oracle Aconex](https://www.g2.com/it/products/oracle-aconex/reviews) — 4.5/5 stars (231 reviews)
- [SafetyCulture](https://www.g2.com/it/products/safetyculturehq/reviews) — 4.6/5 stars (241 reviews)
- [Revizto](https://www.g2.com/it/products/revizto/reviews) — 4.6/5 stars (209 reviews)
- [Touchplan](https://www.g2.com/it/products/touchplan/reviews) — 4.3/5 stars (199 reviews)
- [Dalux](https://www.g2.com/it/products/dalux/reviews) — 4.6/5 stars (176 reviews)
- [BusyBusy](https://www.g2.com/it/products/busybusy/reviews) — 4.8/5 stars (158 reviews)

### Alternatives to Oracle Primavera

- [Octave Sequence Enterprise (EcoSys)](https://www.g2.com/it/products/octave-sequence-enterprise-ecosys/reviews) — 4.1/5 stars (83 reviews)
- [Procore](https://www.g2.com/it/products/procore/reviews) — 4.6/5 stars (4166 reviews)
- [Microsoft Project &amp; Portfolio Management](https://www.g2.com/it/products/microsoft-microsoft-project-portfolio-management/reviews) — 4.0/5 stars (1626 reviews)
- [Contruent Enterprise (formerly ARES PRISM)](https://www.g2.com/it/products/contruent-enterprise-formerly-ares-prism/reviews) — 4.2/5 stars (13 reviews)
- [OpenText Project and Portfolio Management (PPM)](https://www.g2.com/it/products/opentext-project-and-portfolio-management-ppm/reviews) — 4.0/5 stars (29 reviews)
- [Smartsheet](https://www.g2.com/it/products/smartsheet/reviews) — 4.4/5 stars (22097 reviews)
- [Planview AdaptiveWork](https://www.g2.com/it/products/planview-adaptivework/reviews) — 4.1/5 stars (537 reviews)
- [Celoxis](https://www.g2.com/it/products/celoxis/reviews) — 4.6/5 stars (621 reviews)
- [monday Work Management](https://www.g2.com/it/products/monday-com/reviews) — 4.7/5 stars (15380 reviews)
- [ClickUp](https://www.g2.com/it/products/clickup/reviews) — 4.6/5 stars (12428 reviews)

---
## Top Discussions

### Autodesk Forma (formerly Autodesk Construction Cloud)

- Title: [C&#39;è un modo per condividere file con non membri in modo che questo possa essere utilizzato come un sito di file cloud?](https://www.g2.com/it/discussions/24849-is-there-a-way-to-share-files-with-non-members-so-that-this-can-be-used-like-a-cloud-file-site) — 7 comments, 1 upvote
  > **Top comment:** "Credo che se hai un account Autodesk Sign in, puoi avere accesso a un progetto quando l&#39;autore originale ti aggiunge al progetto."
- Title: [BIM 360 funziona con AutoCAD?](https://www.g2.com/it/discussions/does-bim-360-work-with-autocad) — 5 comments, 1 upvote
  > **Top comment:** "Sì, puoi salvare, visualizzare e aprire localmente i file che sono memorizzati in BIM360."
- Title: [In che modo Autodesk Construction Cloud facilita la collaborazione e l&#39;efficienza nel settore delle costruzioni?](https://www.g2.com/it/discussions/how-is-autodesk-construction-cloud-facilitating-collaboration-and-efficiency-in-the-construction-industry) — 3 comments, 1 upvote
  > **Top comment:** "ACC è una piattaforma cloud che può invitare tutti i membri e i proprietari del progetto partecipanti nello stesso ambiente per lavorare alla costruzione di..."
- Title: [non usiamo la piattaforma per pubblicare fogli ma vorremmo farlo - come controlli quali fogli vengono pubblicati? e se ho aggiunte ai fogli che devono essere incluse nel set?](https://www.g2.com/it/discussions/24631-we-do-not-use-the-platform-to-post-sheets-but-would-like-to-how-do-you-control-what-seets-are-being-posted-what-if-i-have-additions-to-the-sheets-that-are-to-be-included-in-the-set) — 3 comments, 1 upvote
  > **Top comment:** "Use the Library section in BIM360 and upload project documentation there"
- Title: [Esiste un piano per integrare i file DWG di AutoCAD in BIM 360, per l&#39;uso diretto da parte di Revit?](https://www.g2.com/it/discussions/is-there-a-plan-for-integrating-autocad-dwg-files-into-bim-360-for-direct-use-by-revit) — 3 comments, 1 upvote
  > **Top comment:** "Nella scheda Gestione Documenti, c&#39;è un pulsante &quot;Carica File&quot;. Carica lì il file AutoCAD. Poi collegalo al modello in BIM 360 Design. In Trevi: Collega..."

### PlanRadar

No discussions available for this product.

### Oracle Primavera

- Title: [A cosa serve Oracle Primavera?](https://www.g2.com/it/discussions/oracle-primavera-what-is-oracle-primavera-used-for) — 1 comment
  > **Top comment:** "È utilizzato dal dipartimento di pianificazione di qualsiasi azienda di costruzioni così come dalle aziende di centrali elettriche, dove questo software è..."
- Title: [Quali sono le caratteristiche e le applicazioni di Primavera?](https://www.g2.com/it/discussions/what-are-the-features-and-applications-of-primavera) — 1 comment
  > **Top comment:** "Sto usando il database eppm per gestire più programmi e progetti utilizzando la versione 20.1"
- Title: [A cosa serve il software Primavera P6?](https://www.g2.com/it/discussions/what-is-primavera-p6-software-used-for) — 1 comment
  > **Top comment:** "construction planning "
- Title: [A cosa serve Oracle Primavera?](https://www.g2.com/it/discussions/what-is-oracle-primavera-used-for) — 1 comment
  > **Top comment:** "Oracle Primavera è utilizzato per gestire il controllo dei costi, i documenti, il programma e la gestione di molti processi. Unifier è così flessibile da..."
- Title: [come faccio ad aggiornare il mio software online](https://www.g2.com/it/discussions/how-do-i-get-my-software-updated-online) — 1 comment, 1 upvote
  > **Top comment:** "Puoi regolare la durata e la relazione tra i compiti"

---
**Source:** [G2.com](https://www.g2.com) | [Comparison Page](https://www.g2.com/it/compare/autodesk-forma-formerly-autodesk-construction-cloud-vs-planradar-vs-oracle-primavera)