# Which Epicor Channel Partners are highest rated for rapid factory floor system rollout based on user reviews?

<p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">Hey G2 community, I've been comparing which <a class="a a--md" elv="true" href="https://www.g2.com/categories/epicor-channel-partners">Epicor Channel Partners</a> are highest rated for rapid factory floor system rollout based on user reviews, and rollout speed here seems to track closely with how disciplined a partner stays about scope during implementation.</p><ul>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/cre8tive-technology-and-design/reviews"><strong>Cre8tive Technology and Design</strong></a><strong>:</strong> At least one implementation stayed ahead of schedule and under budget, suggesting a team comfortable managing scope tightly rather than letting customization requests expand the timeline.</li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/six-s-partners/reviews"><strong>Six S Partners</strong></a><strong>:</strong> A consultant staying focused on concrete operational hurdles rather than broader project management milestones appears to be what kept at least one rollout on track.</li>
<li>
<a class="a a--md" elv="true" href="https://www.g2.com/products/quartz-group-inc/reviews"><strong>Quartz Group, Inc.</strong></a><strong>:</strong> Responsiveness during an active engagement seems to be a consistent strength, though a small team size is a factor worth weighing against rollout speed expectations.</li>
</ul><p class="elv-tracking-normal elv-text-default elv-font-figtree elv-text-base elv-leading-base elv-font-normal" elv="true">For manufacturing teams that have measured actual rollout speed: did staying on schedule come down more to the partner's planning upfront or their responsiveness once the work was underway?</p>

##### Post Metadata
- Posted at: 13 days ago
- Author title: Marketing Executive
- Net upvotes: 1


## Comments
### Comment 1

&lt;p&gt;Honestly this is a small, specialized field, so I&#39;d treat it as vetting implementation firms rather than picking software. The Epicor partners that show up here are CompuData, Sikich and Cre8tive Technology and Design, all of which do Epicor ERP implementations for manufacturers. For a fast factory-floor rollout specifically, I&#39;d push each on their track record with your Epicor version (Kinetic vs older) and shop-floor modules like MES and scheduling. To be real, there aren&#39;t many data points on these partners publicly, so references from manufacturers your size matter more than anything, ask who did their go-live and how long the floor was disrupted. What&#39;s your rollout timeline, and are you greenfield or replacing an existing system?&lt;/p&gt;

##### Comment Metadata
- Posted at: 12 days ago





## Related discussions
- [How well does Trello scale into a larger team?](https://www.g2.com/discussions/1-how-well-does-trello-scale-into-a-larger-team)
  - Posted at: over 13 years ago
  - Comments: 6
- [Can we please add a new section](https://www.g2.com/discussions/2-can-we-please-add-a-new-section)
  - Posted at: over 13 years ago
  - Comments: 0
- [Quantifiable benefits from implementing your CRM](https://www.g2.com/discussions/quantifiable-benefits-from-implementing-your-crm)
  - Posted at: over 13 years ago
  - Comments: 4


